LPDC platform Status: Prototype phase

Application · Generator booster

More power from a small generator

Generators are usually sized for the highest load peak and then run at part load most of the time. With the LPDC platform, a generator sized for the average load is enough. The battery supplies the peaks, the generator recharges it in quiet phases.

Generator 3~ 3 × 1.8 kW
AFE parallel, per phase
380 VDC
ISO isolation
70 VDC
DCD battery, PV
48 V
Battery + PV modules

The AFEs run in parallel with the generator on the same three-phase grid and are synchronised via the sync bus.

27 kW

rated three-phase power in the example

5.4 kW

generator power, 3 × 1.8 kW

32.4 kW

for 3 seconds

120°

three AFEs form a three-phase grid

The task

The generator is too big for everyday use

Construction sites, events and remote locations have load profiles with short, high peaks: compressors, pumps, tools, refrigeration. If the generator is sized for these, it runs far below rated load most of the time. Consumption per kilowatt hour rises, and diesel engines tend to soot up at part load.

A storage system that takes over the peaks allows a much smaller generator. This needs power electronics that feed into the grid in parallel with the generator and can also form a grid without it.

Typical requirements

load peaks far above continuous load

three-phase loads

operation without generator in quiet phases

integration of PV modules

extra-low-voltage battery, e.g. 48 V LiFePO4

expansion as demand grows

Our approach

Two strings per phase, one battery on a shared bus

In the configuration example, six strings of AFE and ISO work together, two per phase. Each phase has its own 380 VDC link. Only behind the galvanic isolation do all strings meet on the shared 70 VDC bus.

01

Low load: generator charges

The generator covers the load. The AFEs use the surplus to charge the battery.

02

Load peak: battery assists

The AFEs feed from the battery into the grid. The generator stays within its rated range.

03

Sun, and generator off

PV modules charge directly on the 70 VDC bus via a DCD with MPPT. With the generator off, the AFEs form the grid from battery and PV alone.

What sets it apart

Why knestronX

Small generator, same power

In the example, a 5.4 kW generator together with the battery supplies 27 kW three-phase to the loads.

Generator at a good operating point

The generator runs steadily close to its rated load, which lowers consumption per kilowatt hour.

Quiet phases without generator

At low load the AFEs form the grid from battery and PV, without noise and exhaust.

Separate DC links per phase

Each AFE works between line and neutral. Separate DC links prevent the phases from being connected through the modules.

PV without detour

The DCD with MPPT charges the battery directly at DC level. No conversion via the AC grid.

Expandable per phase

More AFEs per phase, more ISOs, more DCDs: each point can be expanded independently.

Key data

Specifications at a glance

Parameter Value
Generator in the example 3~, 3 × 1.8 kW = 5.4 kW
Power to loads 27 kW three-phase, 32.4 kW for 3 s (sum of ratings)
AFE 6 units, two per phase, synchronised via sync bus
ISO 6 units, together 6 × 3.6 kW
DCD battery 8 units of 2.88 kW at 48 V and 60 A
DCD PV 1 unit with MPPT
Battery 48 V, e.g. LiFePO4, BMS via CAN
Control 1 master, operating modes and setpoints via CAN

Building blocks used

AFE parallel to the generator, grid-forming when generator is off
ISO connects the per-phase DC links to the 70 VDC bus
DCD battery charge and discharge, PV with MPPT
Master coordinates all modules

Fields of use

hybrid gensets from genset manufacturers construction and event equipment field camps and mobile facilities remote sites and radio stations agriculture and forestry

FAQ

Questions from practice

Which battery fits?

Any battery between 12 and 65 V that communicates with the DCD via CAN. The example uses a 48 V battery, such as LiFePO4. Capacity depends on load profile and the desired runtime without generator.

What happens if the generator fails?

The AFEs then operate grid-forming and supply the loads from battery and PV. Runtime is set by battery capacity.

Can it be smaller?

Yes. One string per phase already gives 16.2 kW three-phase with a 5.4 kW generator. Single-phase, the platform starts with one string and 3.6 kW.

Contact

Let's talk about your application

Tell us your generator power, load profile with peaks and duration, battery voltage and desired runtime without generator.

KNESTEL Technologie & Elektronik GmbH

Osterwalder Strasse 12
87496 Hopferbach, Germany
Phone +49 8372 708-0
vertrieb@knestel.de

Technical data: status prototype phase. Subject to change. Design and sizing depend on the individual project.