LPDC platform Status: Prototype phase

Application · Battery inverter

Battery inverter for storage from 12 to 65 V

Battery manufacturers and integrators building storage systems need power electronics between grid and battery. The LPDC platform provides it as three modules of 3.6 kW each: single-phase from one string, three-phase with three synchronised strings.

230 VAC grid
AFE AC/DC
380 VDC
ISO isolation
70 VDC
DCD DC/DC
12–65 V
Battery 12–65 V

Energy flows both ways: charging from the grid, discharging into the grid or into a separate island grid.

3.6 kW

single-phase at 230 VAC

10.8 kW

three-phase with three strings

12–65 V

adjustable battery voltage

2 / 4 kV

insulation strength of the isolation stage

The task

Good batteries, but no power electronics of their own

Companies that build or integrate batteries want to offer storage without developing an inverter themselves. Off-the-shelf inverters rarely fit: wrong battery voltage, no communication with their own BMS, no way to build the device under their own brand.

Then there is the battery voltage. Many storage systems work at 24, 48 or 51.2 V, in the extra-low-voltage range. The power electronics must isolate this voltage safely from the 230 VAC grid.

Typical requirements

batteries between 12 and 65 V

single- or three-phase grid connection

charge and discharge with one device

communication with your own BMS

build under your own brand

expansion as storage grows

Our approach

One string of three modules

AFE, ISO and DCD form one string. The AFE works at the grid, the ISO module isolates galvanically, the DCD controls battery current and voltage.

01

Charging

The AFE rectifies 230 VAC to 380 VDC as a PFC rectifier. Its input current can be limited to 6, 10 or 16 A so the storage does not overload the building fuse.

02

Discharging

As an inverter the AFE feeds from the battery back into the grid or forms its own grid. With 48 V batteries two DCDs share the 3.6 kW, from 60 V one is enough.

03

Three-phase and larger

Three strings with AFEs synchronised via the sync bus give 10.8 kW three-phase with 120° phase shift. More AFEs per phase increase power further.

What sets it apart

Why knestronX

Power electronics without in-house development

Battery manufacturers combine the modules and parameterise them for their product.

Extra-low-voltage battery side

Batteries up to 65 V are easier to handle, transport and service than high-voltage packs.

Matched to battery voltage

60 A continuous per DCD: 720 W at 12 V, 2.88 kW at 48 V, 3.6 kW at 60 V.

BMS connection

The DCD talks to the battery management system via CAN. Modbus for DTU and monitoring is available as an option.

Expandable step by step

AC side, isolation stage and battery side can be expanded independently.

Adapted for volume

For larger quantities we adapt voltages, power ratings and interfaces.

Key data

Specifications at a glance

Parameter Value
AFE 230 VAC ±10 %, 3.6 kW, 16 A; 5.4 kW for 3 s
ISO 380 to 70 VDC, 3.6 kW, insulation strength 2 or 4 kV
DCD 70 VDC to 12–65 VDC, 60 A continuous, 105 A for 3 s
Power per DCD at 60 A 12 V: 720 W · 24 V: 1.44 kW · 36 V: 2.16 kW · 48 V: 2.88 kW · 60 V: 3.6 kW
Three-phase 3 AFEs via sync bus, 120° phase shift
Options grid-forming operation, CP/PP, MPPT, Modbus, ISO with 4 kV
Interfaces internal CAN, CAN to BMS, Modbus optional, sync bus for AFE
Size of one string 320 × 370 × 120 mm (AFE + ISO + DCD)

Building blocks used

AFE AC/DC conversion, PFC or grid-forming
ISO galvanic isolation 380 to 70 VDC
DCD bidirectional to the battery, 12–65 VDC
Master operating modes and setpoints via CAN

Fields of use

storage systems from battery manufacturers commercial and agricultural storage storage with PV connection storage in containers and equipment rooms

FAQ

Questions from practice

How many DCDs do I need for 3.6 kW?

That depends on battery voltage, because each DCD delivers 60 A continuously. At 60 V one is enough, at 48 V two, at 24 V three.

May the storage feed into the public grid?

Grid-parallel operation follows each country's connection rules, in Germany VDE-AR-N 4105. We plan the certifications with you as part of product development. The modules are at prototype stage.

Can the storage be expanded later?

Yes. More DCDs for additional batteries, more ISOs for more transfer power and more AFEs for more power per phase.

Contact

Let's talk about your application

Tell us battery voltage and capacity, single- or three-phase grid connection and the desired power.

KNESTEL Technologie & Elektronik GmbH

Osterwalder Strasse 12
87496 Hopferbach, Germany
Phone +49 8372 708-0
vertrieb@knestel.de

Technical data: status prototype phase. Subject to change. Design and sizing depend on the individual project.